07576 584901Testmasterinfo@gmail.com

24/7 online enquiries

About

Services

Areas

ReviewsOur WorkSocialContact07576 584901Request a Free Quote

Home/Services/Commercial EICR Testing
# Commercial EICR TestingFixed Wire TestingGreenford, London &amp; Surrounding Areas
Commercial EICR testing across London, including Greenford, Ealing and West London: fixed wire inspection, clearly coded observations and digital reports, with isolation planned around your premises.

Request a Free QuoteCall 07576 584901

£2.5m professional indemnity · Constructionline Bronze · RAMS issued on request

## Get a fixed price for commercial eicr testing
Send us the site details and we will come back with a quote-led fixed price. No published rates, no obligation.

£5,000,000

Public liability insurance

£2,500,000

Professional indemnity cover

Constructionline

Bronze member, working towards Gold in 2026

RAMS issued

Risk assessments and method statements on request

Digital certificates

Issued within one day of payment

Service overview

## What commercial eicr testing involves, and who needs it
Commercial EICR and commercial electrical testing in London: Test Master UK inspects offices, shops, warehouses, workshops, schools and managed commercial buildings. We cover Greenford, Ealing and the wider West London area, along with all London boroughs and surrounding areas. Tell us the premises type, approximate circuit count and access constraints for a free quote.

An Electrical Installation Condition Report inspects and tests the fixed installation: distribution boards, circuits, protective devices, earthing and bonding. If you need an EICR certificate for a West London commercial property, this is the report that records the installation&#x27;s condition and identifies any observations. A satisfactory outcome depends on the inspection results and any necessary remedial work, not simply on booking the test.

Commercial EICRs, often called fixed wire testing or periodic inspection, are what insurers, managing agents, main contractors and enforcing bodies ask for when they want assurance that the building itself is electrically sound. Unlike PAT testing, this is about the infrastructure: what happens when a circuit is overloaded, when an earth path is compromised, or when someone has added a spur to a board nobody has documented.

### Why professional delivery matters

- Sampling and isolation on a live commercial building must be planned. Getting supplies down safely, at a time that does not stop trading, is as much of the job as the testing itself.
- Observation coding is a judgement call with real consequences: a C1 means danger present and immediate action, a C2 means potentially dangerous and urgent remedial, a C3 is an improvement recommendation. Over-coding creates unnecessary spend; under-coding leaves risk in the building.
- Boards in commercial premises are rarely as-built. Undocumented alterations, borrowed neutrals, mixed protective devices and abandoned circuits all need tracing before results mean anything.
- An unsatisfactory report is only useful if the remedial route is clear; we quote and carry out the works needed to bring the installation to a satisfactory, documented state.

### Who this is for

- Commercial landlords and property owners evidencing installation condition
- Facilities management companies running planned maintenance programmes
- Managing agents responsible for landlord supply and communal areas
- Offices, retail units, warehouses and workshops
- Main contractors handing over or taking on a building
- Multi-site businesses standardising compliance across a portfolio

### When it is needed

- Typically every five years for commercial installations, or shorter in higher-risk environments
- At change of occupancy, lease renewal or building handover
- When an insurer or broker requests evidence of installation condition
- Before or after significant alterations, refits or additional load
- When nuisance tripping, overheating accessories or scorching appear
- As part of a pre-acquisition or pre-tender due diligence pack

The cost of leaving it

## What an expired or ignored EICR leads to
A fixed installation degrades quietly. Terminations loosen and heat, insulation ages, protective devices lose reliability, and each undocumented alteration erodes the original design. None of it announces itself until a circuit fails, an accessory scorches, or someone receives a shock.

Commercially, a missing or expired EICR is one of the fastest ways to stall a transaction. Lease negotiations, insurance renewals, tenders and contractor pre-qualification all ask for it, and none of them accept a promise that testing is booked. Where an incident does occur, absence of a current report is the first thing raised.

The worst outcome is the unsatisfactory report received under time pressure: C1 and C2 observations landing days before a deadline, with remedial works, isolation windows and costs that nobody has budgeted for.

### Common mistakes we are called in to fix

- Treating five years as a rule rather than a guide, when environment, use and alterations may justify shorter intervals.
- Commissioning an EICR without agreeing sampling scope, then arguing about coverage after the report lands.
- Accepting an unsatisfactory report and filing it: an unsatisfactory EICR is a to-do list, not a certificate.
- Allowing repeated minor alterations with no board schedule updates, so the next inspection starts from scratch.
- Leaving no time between inspection and deadline for the remedial works the inspection is likely to identify.Call 07576 584901

Our process

## How we deliver commercial eicr testing
Every job follows the same sequence, co-ordinated by a dedicated Operations Manager so attendance fits around your occupants and trading hours.

- 01
### Scope and free quote
We confirm the number of distribution boards and circuits, building type, access constraints and sampling scope, then issue a fixed quote before attending.

- 02
### Planning isolation windows
Our Operations Manager agrees when supplies can be taken down, and phases the work around trading hours, occupants and critical loads. RAMS are issued on request.

- 03
### Inspection
Boards, protective devices, earthing and bonding, accessories, containment and circuit identification are inspected, and existing documentation checked against what is actually installed.

- 04
### Testing
Dead and live testing including continuity, insulation resistance, polarity, earth fault loop impedance and RCD operation, recorded circuit by circuit on the schedule of test results.

- 05
### Coding and reporting
Each observation is coded C1, C2, C3 or FI with a plain-English explanation of what it means and what it will take to resolve.

- 06
### Digital certificate and remedials
The report is issued digitally, typically within one day of payment. Where remedial works are required we quote them so the installation can be brought to a satisfactory, documented state.

What you get

## Outcomes, not promises

### Evidence that stands up
A complete report with schedules of inspection and test results, ready for insurers, agents, contractors and enforcing bodies.

### Risk found before it becomes an incident
Loose terminations, degraded insulation, missing bonding and inadequate protection identified while they are still maintenance rather than emergency.

### Costs you can plan
Coded observations with priced remedials let you sequence works across budget periods instead of reacting to a single unaffordable list.

### Trading continuity
Isolation planned around occupants and critical loads, with out-of-hours attendance where daytime shutdown is not an option.

### A documented, satisfactory end state
We carry out the remedial works ourselves, so observations get closed out rather than carried forward to the next inspection.

### Portfolio consistency
Common reporting and scheduling across multiple sites, co-ordinated through one point of contact.

## Commercial EICR testing in London: scope, access and results
For a London or West London site, agree which boards and circuits are included, who can authorise isolation and when access is available. The report should make both its scope and its findings clear.

### Observation codes explained
C1 means danger is present and there is a risk of injury; immediate action is required and we will make safe where we can on the day. C2 means potentially dangerous, requiring urgent remedial action. C3 is an improvement recommendation and does not on its own make a report unsatisfactory. FI means further investigation is required. A report is unsatisfactory if any C1, C2 or FI is present. We explain each code in plain language so you are not decoding your own report.

### Sampling and scope
Full testing of every circuit in a large building is often impractical in a single visit, so a sampling percentage is agreed in advance and stated on the report. Where sampling reveals a pattern of defects, scope is extended rather than the finding being averaged away. Agreeing this before attendance prevents disputes about coverage afterwards.

### Distribution boards and protective devices
Board condition, device type and rating, discrimination, RCD and RCBO operation, correct circuit identification and the presence of an accurate board schedule all form part of the inspection. Mixed manufacturers&#x27; devices within one board and obsolete boards are frequently found and are recorded with the appropriate code.

### Earthing and bonding
Main protective bonding to incoming services, supplementary bonding where required, earthing conductor sizing and the integrity of the earth path are checked. Bonding defects are among the most common findings in older commercial premises and are also among the cheapest to correct.

### Multi-tenanted buildings and landlord supply
In multi-let buildings the landlord supply, risers, plant and communal areas are typically inspected separately from demised tenant areas. Defining that boundary up front avoids the common situation where nobody has tested the risers because each party assumed the other had.

### Alterations, refits and additional load
Office refits, EV charging, additional HVAC and higher IT density all change the load profile of an installation that may have been designed decades earlier. Inspection considers whether protection and capacity still match actual use, not just whether the original design was compliant.

### Commercial versus residential reports
The inspection principles are shared, but commercial installations involve three-phase supplies, sub-mains, larger board counts, mechanical plant and containment systems, and they usually require staged isolation. Residential reports are smaller in scope and driven by letting requirements. We deliver both, and for mixed-use buildings we co-ordinate them together.

### Closing out remedial works
Once observations are coded, we quote the works required to clear them. Completing remedials with the same team that carried out the inspection removes the gap where one contractor blames another&#x27;s coding, and produces a clean documented record from inspection to resolution.

### Related services
Residential EICR TestingPAT TestingRemedial Works for Fire Compliance

Where we work

## Commercial EICR Testing in Greenford and across London
Mobile visits across Greenford, all London boroughs and surrounding areas, with multi-site portfolios coordinated through one point of contact.

### EICR Testing in London

- EICR Testing Barking and Dagenham
- EICR Testing Barnet
- EICR Testing Bexley
- EICR Testing Brent
- EICR Testing Bromley
- EICR Testing Camden
- EICR Testing Croydon
- EICR Testing Ealing
- EICR Testing Enfield
- EICR Testing Greenwich
- EICR Testing Hackney
- EICR Testing Hammersmith and Fulham
- EICR Testing Haringey
- EICR Testing Harrow
- EICR Testing Havering
- EICR Testing Hillingdon
- EICR Testing Hounslow
- EICR Testing Islington
- EICR Testing Kensington and Chelsea
- EICR Testing Kingston upon Thames
- EICR Testing Lambeth
- EICR Testing Lewisham
- EICR Testing Merton
- EICR Testing Newham
- EICR Testing Redbridge
- EICR Testing Richmond upon Thames
- EICR Testing Southwark
- EICR Testing Sutton
- EICR Testing Tower Hamlets
- EICR Testing Waltham Forest
- EICR Testing Wandsworth
- EICR Testing Westminster
- EICR Testing Greenford

Wider coverage: Manchester, Kent, Suffolk, Essex, Scotland, Wales. All coverage areas · Check your postcode

## Commercial EICR Testing questions, answered
If your question is not here, call us; we will tell you what your premises needs and what it does not.

Call 07576 584901

How much does a commercial EICR cost?Pricing is quote-led and driven by the number of boards and circuits, building type, access and agreed sampling scope. Send us those details and we will return a fixed price at no cost.

How often should a commercial EICR be carried out?Commercial installations are commonly inspected every five years, with shorter intervals in higher-risk environments or where use has changed significantly. We will advise on an appropriate period for your installation.

How long will testing take and will you cut the power?Duration depends on board and circuit count. Some testing requires isolation, so we agree windows in advance and can work outside trading hours or phase the work board by board to protect critical loads.

What does an unsatisfactory EICR mean?It means at least one C1, C2 or FI observation was recorded. It is not a fine or a shutdown notice; it is a prioritised list of what must be corrected. We quote the remedial works so the installation can be brought to a satisfactory state.

When do I get the report?Reports are issued digitally, typically within one day of payment, including the schedules of inspection and test results.

Can you carry out the remedial works too?Yes. We provide remedial works for electrical and fire compliance, so observations can be closed out and evidenced rather than carried into the next inspection.

Do you provide RAMS for site access?Yes. Risk assessments and method statements are issued on request, and we are a Constructionline Bronze member working towards Gold in 2026.

Do you cover multiple sites?Yes. Multi-site portfolios across all London boroughs, Greenford and surrounding areas are co-ordinated by a dedicated Operations Manager.

Can you attend at short notice?Our engineers are mobile and we are frequently able to attend at short notice. Call us with the deadline you are working to and we will tell you honestly what is achievable.

## Useful guides for your premises
All electrical and fire safety guides

- EICR testing explained: what electrical measurements tell the inspector
- How often does EICR testing need to be done? Building a maintenance calendar
- EICR for commercial property: landlord, occupier and maintenance responsibilities
- EICR certificate cost: what affects a quote and what to compare
- EICR inspection: what happens during a professional electrical assessment?
- EICR codes meaning: interpreting observations and avoiding common mistakes
- Commercial EICR testing: planning access and electrical downtime
- EICR testing and PAT testing: what is the difference?
- EICR testing codes explained: C1, C2, C3 and FI
- Planning PAT testing, EICR testing and fire safety across multiple London sites

## Get commercial eicr testing booked and documented
Send us the details and we will return a fixed, quote-led price. Certificates are issued digitally, typically within one day of payment. If you are working to a deadline, calling is fastest.

- £5,000,000: Public liability insurance
- £2,500,000: Professional indemnity cover
- Constructionline: Bronze member, working towards Gold in 2026
- RAMS issued: Risk assessments and method statements on request07576 584901Testmasterinfo@gmail.com

Electrical and fire safety compliance testing for businesses, property managers and landlords across London and Greenford.

Read our Google reviewsLeave us a review

## Services

- PAT Testing
- Commercial EICR Testing
- Residential EICR Testing
- Emergency Lighting Testing
- Fire Alarm Testing
- Fire Extinguisher Servicing
- Fire Door Inspection
- Fire Risk Assessments
- Remedial Works for Fire Compliance

## Service Areas

- Greenford
- Central London
- All London Boroughs
- West London
- North London
- South London
- East London
- Ealing
- Uxbridge
- Slough
- Watford

## Contact

- 07576 584901
- Testmasterinfo@gmail.com
- Postal address669 Greenford Road, UB6 8QL
- LinkedInOpening hours: 24/7 online enquiries

© 2026 Test Master Ltd. All rights reserved.

HomeAboutReviewsOur WorkContactPrivacy PolicyTerms &amp; ConditionsCookie Policy

Call NowFree Quote

Chat on WhatsApp