07576 584901Testmasterinfo@gmail.com

24/7 online enquiries

About

Services

Areas

ReviewsOur WorkSocialContact07576 584901Request a Free Quote

Home/Blog/EICR testingEICR testing

# An unsatisfactory EICR testing report: what to do next
By Test Master UK4 October 20262 min read

Service illustration: eicr testingReceiving an unsatisfactory EICR testing report means the findings need action; it does not tell you that every part of the installation must be replaced. Read the observations, understand any immediate danger and ask the inspector to explain the required work or investigation. A calm, documented response is more useful than either ignoring the report or accepting an unclear repair proposal.

## Deal with urgent danger first
A C1 finding identifies danger present and requires immediate remedial action. Follow competent advice on making the situation safe. C2 observations require urgent remedial action. FI wording and its effect on the report&#x27;s outcome changed in the 2026 amendment, so ask the inspector to explain the report&#x27;s edition and each finding. Do not let collecting quotations delay a necessary safety response.

If there is smoke, exposed live equipment or an electrical injury risk, keep people away and obtain the appropriate urgent help. Never attempt live electrical work yourself or reconnect something that has been isolated for safety.

## Create an observation-by-observation plan
Keep each code with its description and location. Ask for clarification where you cannot identify the affected part of the installation. FI requires investigation to understand the problem; it should not be turned into a guessed remedy without the required assessment.

Agree what work is proposed, what it addresses and which technical documents will demonstrate completion. C3 recommendations can be considered as improvements, but they are not interchangeable with C1, C2 or FI observations.

## Follow the applicable deadlines
For private rented properties covered by England&#x27;s regulations, required remedial work or further investigation must be completed within 28 days or the shorter period specified in the report. Written confirmation and the original report must be handled as the government guidance directs. That maximum period does not reduce the urgency of an immediate danger.

For a rental installation, contact the residential EICR testing service with the complete report. Businesses can discuss commercial EICR testing and report findings. Do not send only a screenshot of the conclusion if the full observations are available.

## Keep a complete evidence trail
Store the original report, agreed work scope, investigation findings and written completion evidence together. Record who reviewed the documents and any further action needed. A quote or invoice confirms a commercial transaction, not necessarily that the installation now meets the required safety standard.

- Prioritise immediate danger and urgent findings.
- Clarify each observation and its location.
- Track the report&#x27;s deadlines and applicable duties.
- Obtain and retain technical completion evidence.

## Sources and further reading

- GOV.UK: Electrical safety standards in rented homes
- IET: Further investigation and EICR classification changes in 2026General guidance for premises in England, checked on 5 November 2026. Requirements depend on your property, systems and applicable conditions. Follow competent advice, current official guidance and your local authority&#x27;s requirements.

## In this guide

- Deal with urgent danger first
- Create an observation-by-observation plan
- Follow the applicable deadlines
- Keep a complete evidence trail
## Need testing for your premises?
Greenford-based electrical and fire safety services across London.

Get a free quote 07576 584901

## Related guides
All guides 

EICR testing · 3 min read

## EICR testing codes explained: C1, C2, C3 and FI
Read the common EICR testing observation codes, understand an unsatisfactory outcome and plan competent remedial work without overlooking urgent risks.

14 October 2026

EICR testing · 2 min read

## How often do landlords need EICR testing in England?
Understand the five-year maximum for relevant rented-home electrical inspections in England, earlier report dates and how to manage remedial evidence.

15 October 2026

Electrical and fire safety compliance testing for businesses, property managers and landlords across London and Greenford.

Read our Google reviewsLeave us a review

## Services

- PAT Testing
- Commercial EICR Testing
- Residential EICR Testing
- Emergency Lighting Testing
- Fire Alarm Testing
- Fire Extinguisher Servicing
- Fire Door Inspection
- Fire Risk Assessments
- Remedial Works for Fire Compliance

## Service Areas

- Greenford
- Central London
- All London Boroughs
- West London
- North London
- South London
- East London
- Ealing
- Uxbridge
- Slough
- Watford

## Contact

- 07576 584901
- Testmasterinfo@gmail.com
- Postal address669 Greenford Road, UB6 8QL
- LinkedInOpening hours: 24/7 online enquiries

© 2026 Test Master Ltd. All rights reserved.

HomeAboutReviewsOur WorkContactPrivacy PolicyTerms &amp; ConditionsCookie Policy

Call NowFree Quote

Chat on WhatsApp